If it’s a double-layer connection,
Generally#the bottom layer will have one more row than the top layer.
For example#if the upper layer is 1m wide,
The lower layer will need to be 2m wide.
First#place the bottom two rows side by side,
After filling them completely,
Level the soil layer nicely
To make the surface of the upper layer smooth.
Then fill up the next layer.